Engineering, Construction & Building Materials · Mechanical Systems & Reliability
HVAC & Building Commissioning
Make sure your building's HVAC and controls work the way they were designed to
Discuss this serviceWhat it is
HVAC & Building Commissioning
We verify that heating, ventilation, air conditioning, and building automation systems are installed and operating as designed, on new construction or in existing buildings. Our work includes design and submittal review, functional performance testing, and retro-commissioning that finds and corrects problems in older systems.
- Typical duration
- Throughout construction for new projects; 3 to 8 weeks for retro-commissioning
The business problem
Why clients need this
Many buildings never perform as intended. Controls drift, sequences are overridden, equipment is mis-set, and comfort complaints and high energy bills follow.
- 01
New systems are handed over without independent functional testing, leaving defects to be found by occupants.
- 02
Existing buildings run with outdated schedules, overridden controls, and failed sensors that waste energy.
- 03
Green building certifications and utility incentive programs often require commissioning documentation.
Our approach
How we deliver it
- 1
Owner's Requirements & Design Review
Documenting what the owner needs from the systems and reviewing the design and equipment submittals against those requirements.
- 2
Installation Inspection & Functional Testing
Checking installation quality and testing equipment and control sequences under realistic operating conditions.
- 3
Retro-Commissioning of Existing Buildings
Reviewing trend data, schedules, and setpoints to find operating faults and low-cost improvements.
- 4
Issues Log & Handover
Tracking each deficiency to closure and delivering a commissioning report, systems manual, and staff training notes.
Data & AI
How technology strengthens this service
Building automation trend data is analysed to detect simultaneous heating and cooling, stuck dampers, and schedule errors, so problems are found from data and not only from walk-throughs.
How we use AI across our workTypical deliverables
What you receive
- Owner's project requirements and commissioning plan
- Design and submittal review comments
- Functional performance test results
- Issues log with resolution status
- Final commissioning report and systems manual
Outcomes
What changes for you
- Systems verified to meet the owner's requirements before acceptance
- Operating faults found and corrected in existing buildings
- Documentation to support certification and utility incentive programs, where applicable
Who it is for
- Building owners & developers
- Hospitals & campuses
- Commercial real estate operators
- Facility managers
FAQs
Common questions
What is the difference between commissioning and retro-commissioning?+
Commissioning verifies new systems during design and construction. Retro-commissioning is a systematic review of an existing building to find and fix operating problems.
Do you follow a specific standard?+
We follow recognised practice such as ASHRAE guidelines for commissioning, together with the project specification and any certification program requirements.
Can retro-commissioning reduce energy use?+
Often it does, because many savings come from correcting schedules and control settings. The amount depends on the building, and we estimate it from your data.
Related
More from Engineering, Construction & Building Materials
Structural Audit & Building Health Check
Independent assessment of structural safety, condition, and remaining service life.
Explore the service
Independent Design Review & Value Engineering
Third-party design review that removes avoidable cost and constructability risk before construction.
Explore the service
Project Management Consulting (PMC)
Owner-side control of schedule, cost, contractors, and quality on capital projects.
Explore the service
Article · Engineering, Construction & Building Materials
Capital projects: close the gap between plan and field
Clear scope, current cost and schedule data, and accountable decisions help owners manage delivery risk on complex projects.
11 October 2026 · 5 min read
Discuss hvac & building commissioning with our team
Tell us about your site, plant or network. A senior consultant will reply within two business days.
