Electrical Commissioning

Make sure new electrical equipment works as designed before it is energized

Discuss this service

What it is

Electrical Commissioning

We provide independent verification that electrical systems have been installed correctly and perform as specified. Our work covers review of test plans and procedures, witnessing or performing acceptance tests on switchgear, transformers, protective relays, and cabling, and a documented handover to the owner.

Typical duration
2 to 10 weeks depending on project size and the number of systems

The business problem

Why clients need this

Installation errors, loose connections, and incorrect relay settings often stay hidden until equipment is under load, when failures are costly and unsafe.

  1. 01

    Contractor testing may be incomplete, undocumented, or not independent of the party that installed the equipment.

  2. 02

    Owners and lenders increasingly ask for independent test records before accepting a project.

  3. 03

    Baseline test data is not captured, so future maintenance testing has nothing to compare against.

Our approach

How we deliver it

  1. 1

    Specification & Test Plan Review

    Reviewing the project requirements and the contractor's test plan against recognised acceptance testing standards such as NETA.

  2. 2

    Inspection & Testing

    Visual and mechanical inspection, insulation resistance, contact resistance, ratio, and protective relay tests, performed or witnessed by qualified personnel.

  3. 3

    Functional & Protection Checks

    Verifying control schemes, interlocks, and protective relay operation against the approved settings.

  4. 4

    Punch List & Handover

    Documenting deficiencies, tracking corrections to closure, and handing over a clear set of test records and baseline data.

Data & AI

How technology strengthens this service

Test results are captured as structured records, not just scanned forms, so values can be trended against baseline during later maintenance testing and flagged when they drift.

How we use AI across our work

Typical deliverables

What you receive

  • Test plan review comments
  • Witnessed or performed test records for each piece of equipment
  • Deficiency log tracked to closure
  • Commissioning report with baseline test data

Outcomes

What changes for you

  • Independent evidence that equipment is ready to be energized
  • Installation problems found before they cause outages or safety incidents
  • A baseline record to support future maintenance

Who it is for

  • Project owners & developers
  • Data centre & industrial plant builders
  • Renewable energy project owners & lenders
  • Utilities & campuses

FAQs

Common questions

How is independent commissioning different from the contractor's own testing?+

The contractor tests to prove their own work. An independent party verifies on behalf of the owner, with no stake in passing the installation.

Which standards do you test against?+

We work to the project specification and recognised standards such as NETA acceptance testing specifications, the manufacturer's instructions, and the codes adopted by the local authority.

Can you commission solar and battery storage projects?+

Yes. We cover the electrical balance of plant, including medium-voltage equipment, inverters, and protection, and coordinate with the utility interconnection requirements.

Related

More from Energy, Utilities & Renewables

Discuss electrical commissioning with our team

Tell us about your site, plant or network. A senior consultant will reply within two business days.

Discuss this service